妺妺窝人体色777777野大粗,衣服被扒开强摸双乳18禁网站,扒开老师双腿猛进入出白浆,欧美性狂猛XXXXX深喉

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.yyfq666.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

用于地鐵建設(shè)的施工圍擋怎么順利安裝?

來(lái)源:http://www.yyfq666.com/   發(fā)布時(shí)間:2023-02-10

地鐵施工圍擋規(guī)格大部分規(guī)格為長(zhǎng)6.2米,高2.3米。它由一個(gè)柱子、一個(gè)隱藏柱子、兩個(gè)梁和四個(gè)面板組成。立柱上可安裝太陽(yáng)能燈,白天做裝飾并作為夜間照明。下面施工圍擋廠家來(lái)講講用于地鐵建設(shè)的施工圍擋怎么順利安裝的問(wèn)題。
Most specifications of subway construction enclosure are 6.2 meters long and 2.3 meters high. It consists of a column, a hidden column, two beams and four panels. Solar lamp can be installed on the column for decoration in the daytime and lighting at night. Next, the construction enclosure manufacturer will talk about how to install the construction enclosure for subway construction smoothly.
1、地鐵施工圍擋的立柱要逐根安裝,不能同時(shí)豎立多跟立柱。因?yàn)榱⒅捶€(wěn)定時(shí),容易傾倒,砸傷施工人員。
1. The columns of subway construction enclosure shall be installed one by one, and multiple columns cannot be erected at the same time. Because when the column is not stable, it is easy to topple and hurt the construction personnel.
2、地鐵施工圍擋所用到的任何材料都不能亂放或者隨意亂丟,材料交接的時(shí)候都要注意,否則可能會(huì)因?yàn)槲锲返袈湓覀绞┕と藛T或者路過(guò)的行人及車輛。
2. Any materials used in the subway construction enclosure shall not be placed or thrown randomly. Pay attention to safety when handing over materials, otherwise the construction personnel or pedestrians and vehicles passing by may be injured by falling objects.
3、在進(jìn)行地鐵施工圍擋施工前,必須要將周邊的地區(qū)進(jìn)行臨時(shí)封閉,在各路口或者施工周邊區(qū)域設(shè)立警示牌和拉上警示線。在夜間的時(shí)候,還要在地鐵施工圍擋四個(gè)角處安裝警示燈,提醒此處施工注意。
3. Before the construction of subway construction enclosure, the surrounding areas must be temporarily closed, and warning signs and warning lines must be set up at each intersection or in the surrounding area of construction. At night, safety warning lights should also be installed at the four corners of the subway construction enclosure to remind the construction here to pay attention to safety.
施工圍擋廠家
4.地鐵施工圍擋的施工人員要做好自身的防護(hù),按照公司的要求穿戴好防護(hù)衣物和帽。在日常工作的時(shí)候,不能出現(xiàn)疲勞作業(yè)的情況在施工過(guò)程中,一旦發(fā)現(xiàn)異常問(wèn)題,要及時(shí)地向上匯報(bào)。施工隊(duì)管理人員也要做好對(duì)施工人員的監(jiān)督和管理工作,才能讓地鐵施工圍擋安裝變得加和順暢。
4. The construction personnel of the subway construction enclosure shall do their own protection and wear protective clothing and safety helmet according to the company's requirements. In daily work, fatigue work cannot occur. In the process of construction, once abnormal problems are found, they should be reported to the superior in a timely manner. The management personnel of the construction team should also do a good job in supervising and managing the construction personnel, so as to make the subway construction enclosure installation more safe and smooth.
如施工圍擋的下部基礎(chǔ)尚未形成,可將預(yù)制預(yù)埋件敷設(shè)在墻體平面以后將立柱鋼襯用電焊方式與預(yù)埋焊接,但預(yù)設(shè)時(shí)必須注意直線與水平線?;蛘邔⒘⒅撘r增加長(zhǎng)度直接預(yù)埋在墻體內(nèi),待墻體養(yǎng)護(hù)期后即可正式施工,這兩種方式特點(diǎn)是較螺栓連接更為牢固。
If the lower foundation of the construction enclosure has not yet been formed, the prefabricated embedded parts can be laid on the wall plane and the steel lining of the column can be welded with the embedded parts by electric welding. However, attention must be paid to the straight line and horizontal line when presetting. Alternatively, the increased length of the steel lining of the column can be directly embedded in the wall, and the formal construction can be carried out after the curing period of the wall. The characteristics of these two methods are more secure than the bolt connection.
施工圍擋安裝前通常是土建已形成交付磚砌或砼澆搗的下部基礎(chǔ),可采用機(jī)械式脹栓、化學(xué)螺檢等方式將立柱鋼襯底板固定在下部基礎(chǔ)的中心部位作直線均布。立柱鋼襯的間距須與設(shè)計(jì)尺寸一致,保證預(yù)裝配的半成品能與之連接。
Before the installation of the construction enclosure, it is usually the civil engineering that has formed the lower foundation for delivery of brickwork or concrete pouring and tamping. The steel lining bottom plate of the column can be fixed at the center of the lower foundation by means of mechanical expansion bolts, chemical screw inspection, etc. for uniform distribution in a straight line. The spacing of the column steel lining must be consistent with the design dimension to ensure that the pre-assembled semi-finished products can be connected with it.
施工圍擋頂部安裝太陽(yáng)能警示紅燈,間距與型鋼立柱一致,在臨行車道圍擋外側(cè)設(shè)置反光膜標(biāo)志。圍擋外側(cè)采用公司指定的背景圖案,并配有經(jīng)公司批準(zhǔn)的宣傳標(biāo)語(yǔ),既能起到宣傳警示作用,又充分發(fā)揮了圍擋的使用。您有需求可以隨時(shí)來(lái)我們網(wǎng)站http://www.yyfq666.com咨詢!
Solar warning red lights shall be installed on the top of the construction enclosure, with the spacing consistent with the section steel column. Reflective film signs shall be set on the outside of the temporary lane enclosure. The outer side of the fence adopts the background pattern designated by the company and is equipped with the company's approved slogans, which can not only play the role of publicity and warning, but also give full play to the use of the fence. You can come to our website at any time if you need http://www.yyfq666.com consulting service

丰满少妇与大狼拘作爱| 十八18禁国产精品WWW| 午夜福利AV无码一区二区| 精品无码国产一区二区| 国产成人精品无码片区在线观看 | 性猛交XXXX乱大交派对| 20岁自慰喷出白浆| 被特种兵CAO的合不拢腿| 国产精品久久久久乳精品爆| 最近在线观看免费完整版高清电影| 无码人妻精品一区二区三区9厂| 麻豆AV天堂一区二区香蕉| 免费无码又爽又刺激激情视频软件| 欧美又粗又大又黄AV片| 无码播放一区二区三区| 午夜福利影院| 一二三四在线观看免费中文动漫版 | 乱码AV午夜噜噜噜噜| 日本一卡二卡不卡视频查询| 无码人妻精品一二三区免费| 成人视频在线观看| 亚洲AV永久无码精品天堂动漫 | 被十几个男人扒开腿猛戳| 久久久受WWW免费人成| 久久久久久久精品成人热色戒| 日本道二区高清视频| 日本熟妇色XXXXX日本免费看| 97丨九色丨国产人妻| 免费看国产曰批40分钟视频网站| 高潮小受站不住了GAY片| 男人扒开女人腿桶到爽免费| 偷拍农民工嫖妓BBBBB| 西西人体扒开大胆大尺度展露 | 日产一二三四六七区| 国内精品人妻无码久久久影院| 亚洲精品无码| AV无码久久久久不卡网站下载| 久久久久久AV无码免费网站| 放荡娇妻肉交换H| 人妻含泪让粗大挺进| 欧美又大又黄又粗又长A片|